Efficent Productivity England Trio Motion Controller Non Woven Box Bag Making Machine
Contact : Sara Yang
Mob : 0086-18767715501(whatsapp , viber , wechat)
Skype : sara.yang64
Machine Video Link:
https://www.youtube.com/watch?v=XL6cxbKRBkc
Brief Introduction:
-Nonwoven bag making machine is our a big innovation in non woven bag making machine industry.
-We launched this new design at 2014,and now it is widely used in Chinese
market for wine,drink,gift and others package.
-It can directly forming non woven box bag with loop handle automatically.
-The finished bag with no need for reversal.
-Its a perfect machine for win bag,drink bag and shopping bag production.
Technician parameter:
Model | LEADER |
Production Speed | 40-50PCS/MIN |
Bag Size |
10-20cm (Gusset) 24-45cm (width) 22-50cm (high) |
Loop Handle Range | 38-56cm |
Air Pressure Request | 1.2m³/min ,1.0Mpa |
Total Power | 40KW |
Power Request | 380V ,50Hz, 3 Phase |
Overall Size | 9100*4600*2300mm |
Total Weight | 10000KGS |
Laminated Non Woven Bag Made By Leader Compares To Other Bags:
Advantages And Characteristics
1. The World First Design
-The world’s initiative bag making machine with China national patent,forms a box bag by one time.
2. Efficent Productivity
-Only need 2 operators,greatly saved the labor cost. And ensured big order’s timely delivery with
10% drop in overall market price.
3. Durable
-Since there is no needle damage on the cloth,the fastness were further enhanced pull strength
increased from 10kg(handle sewing bags) to 20kg.
Evaluation For One Time Off Forming Non Woven Bags:
1- Eco-friendly,durable,easy to take with recycle,water proof and moisture resistant .
2- Good looking and economic .
3- Low cost and few worker required .
4- High daily output.
5- It is a good future to replace the manually sewing the box bag.
Installation:
The seller will send 1 engineer to install, test the production line and train customers’ workers in buyers’ factory. It will take 1 week for whole installation and training.
The seller should cover engineers’ salary and visa cost for 10days. And the buyer should cover Round air tickets, accommodations, transportation in buyers’ country, food, medical care, safety cost, and related cost happens in buyers’ country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations. The buyer should pay 100 USD of engineer’s salary start from 11th day.
Guarantee:
Guarantee period for the delivered equipment will be 12month after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller’s technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Packing:
As per export standard, they will also be treated before delivery against damage and rusting.
Bags Samples